Operation and Maintenance
DOI:
https://doi.org/10.13052/dgaej2156-3306.1635Abstract
Operation of small-scale cogenerators is automatic. Whether the
cogeneration system is intended to run 24 hours/day or within
hourly parameters, it will be sensitive to preset limits on time, tem-
perature, or internal operating parameters. Of course, the system may
be started and stopped manually or via computer commands entered
manually, but usually that’s only done when the system is restarting
after a manual or forced shut down

