Combined Cycle/TES Plant Can Save $1 ,244,474 per Year

P roposed Cogen Syste m for a 1,lO O,OOO -ft 2 Medica l Com plex H as a P ayback Period of 2.6 Year s

Authors

  • Milt on Mechle President Design Build S yst em s

DOI:

https://doi.org/10.13052/dgaej2156-3306.1232

Abstract

Th is a rt icle pr esen ts a comp ar ativ e an a lys is b etw een an inn ova -
tive "proposed," com bine d he at in g/coolin g cogene ra tion pow er plant
and a "base" pl ant for a n appr oximately 1.1 milli on ft 2 ho spit al/ office
complex t o be located in Toledo, Ohi o. The comp lex con sists of th ree
bui ldings: a six -story hospita l and tw o identi ca l 12-story office towers :
Whi le ea ch of the bui ldings in th e base plant h as it s own centra l plant ,
th e pr oposed Mod ular H ybrid Com bine d Cycle Coge ne r a t ionlT ES
pl ant is design ed to se rve th e ent ire complex .
Th e compa ra ti ve an a lysis b et ween th e tw o pl ant s h as shown
su bsta ntia l cost sav ings for th e proposed p lant beca use of r edu cti on in
uti lit y a n d m aint en an ce cost s and, the re fore, th e tot a l annu al oper a t -
ing costs of th e ove ra ll p lant . Thi s r educti on in op erat in g co st s is
mai nl y du e to th e fact that appro xim at ely 95% of th e tot a l r equi r ed
an nual electr ical pow er is prod uced on-site by cogen eration, and th ere -
fore on ly 5% of it s annu al est imate d pow er need s ar e n eeded to be
purch ased from a utilit y.
Reduction in t he numb er of pl ant oper ato rs for th e pr oposed pla nt
has a lso mad e siza ble cont ribut ion to th e annu al oper at ing cost sav -
in gs . Al th ough th e in st all ed fir st cost of t he pr oposed plant was hi gh er
in com pa rison, th e total oper at ing cost savi ngs of $1,244,474 p er year
has re sult ed in a cost -effective simple pa yba ck p eri od of 2.6 yea r s for th e pr oposed pl ant .
Addi ti onall y, th e design of th e pr oposed plan t has resul ted in a
s ubsta nt ia lly com pact ce nt ra l plan t (an a pproximate ly 29 Cff decrea se in
ph ysical size) in compa rison to th e base pl ant hav in g thr ee se pa ra te
ce nt r al plant s. Th e full y dedic at ed pr oposed plan t contri b utes to re-
du ced dem and ch ar ges associated wit h the t ime-of-use electr ical ra tes,
b ett er ope rat ion and m ain ten an ce, efficient ene rgy man agem ent ,
hi gh er ove ra ll sys te m efficiency, and reduc ed levels of emissions and
noise.
With th e a nt icipa te d nati onwide der egul ati on of t he elect ric util-
ity indu s tr y (already und er way in 40 s ta te s ), the pr oposed pl ant can
offer via ble solutions to elect ric, s tea m, h eatin g and cooling gene ra tio n
need s for l ar ge multi-building complexes

Downloads

Download data is not yet available.

References

Tatum , R. (Contributing Edit or ). 1996 . "GLOBAL WARMING,

Thermal En er gy Stor age Syst em Shift s and Reduces En er gy

Use ," Build ing Operating Manag ement, May .

Tech Tip , Curr en t & Futur e Global Power , (1996). Indu stry Ne t

Report, Moti on Contr ol & Drives, Sept .

Kraul , C. (1996). "EN ERGY: Deregulati on Effort t o Begin ," Los

An geles Tim es, Secti on D (Business ), Aug, 28.

Meckl er, M. (1984). "Cogene r ation at Industrial and Chemical

Proc ess Plant s in China , China-U.S. Exchange, China-U.S . Ex-

chang es and China Association for Science and Technology,

Peoples Republic of China, June 25 - July 12.

John st on, W.E. (1996). Technology Report: Cogeneration , En-

ergy User News, Vol. 21, No.7, July.

Meckler, M. (1994). Retrofitting Buildings for En ergy Conserva -

tion , Chapt er 7: Cogeneration as a Retrofit Strat egy , pp 93-114 ,

Fairmont Pres slPr entice Hall.

Meckl er, M. (1989). Int egrate Desicc ant Cooling, Th ermal Stor-

age , Cogen erati on, Power, Mar ch.

Mechanic Minimized in Power Generation , (1996). Indu stry Ne t

Report, Motion Control & Driv es, Sept.

Bloomqui st , R.G. (1996). Reduction in Air Emi ssions Attainable

thr ou gh Impl em entation of Di strict H eating and C ooling ,

A S H RAE Tran sactions, Vol. 102, Pt. 2.

P at ent s p endin g.

Cross, K. et al. (1995). Modeling of Hybrid Combusti on Turbin e

Inl et Air Cooling Sy st em s, ASHRAE Transa ctions.

Downloads

Published

1997-06-19

How to Cite

Mechle, M. on . (1997). Combined Cycle/TES Plant Can Save $1 ,244,474 per Year: P roposed Cogen Syste m for a 1,lO O,OOO -ft 2 Medica l Com plex H as a P ayback Period of 2.6 Year s. Distributed Generation &Amp; Alternative Energy Journal, 12(3), 23–60. https://doi.org/10.13052/dgaej2156-3306.1232

Issue

Section

Articles