He, Z. ., Jiang, S. ., & Yao, C. . (2025). Analysis of Influencing Factors on Transmission Line Construction Schedule Based on Fuzzy ISM. Distributed Generation &Amp; Alternative Energy Journal, 40(05-06), 973–1008. https://doi.org/10.13052/dgaej2156-3306.40564