A TWO UNIT PARALLEL LOAD SHARING SYSTEM WITH ADMINISTRATIVE DELAY IN REPAIR

Authors

  • Alka Chaudhary Department of Statistics, Meerut College, Meerut, India
  • Suman Jaiswal Department of Statistics, Meerut College, Meerut, India
  • Rakesh Gupta Department of Statistics, C.C.S. University, Meerut, India

Keywords:

Transition Probabilities, Mean Sojourn Time, MTSF, Availability, Expected Busy Period of Repairman, Net Expected Profit.

Abstract

The paper deals with the stochastic analysis of a two non-identical unit parallel system model assuming that an administrative delay occurs in getting the repairman available with the system whenever needed. Upon failure of a unit, the other operating unit shares the load of previous one. The failure time distributions of the units are assumed to be exponential whereas the repair time distributions of the failed units and administrative delay time distribution are taken general having different c.d.f.’s. By using regenerative point technique, various performance measures of system effectiveness have been obtained.

Downloads

Download data is not yet available.

References

Chib, R., Joorel J.P.S. and Sharma, V. (2014). Profit analysis of a two-unit

priority system with two-types of repair facility and proviso of rest, Int. J. of

Statistics and Relaiability Engineering, 1(1), p. 69-81.

El-Said, K.M. and El-Sherbeny, M.S. (2010). Stochastic analysis of a two-unit

cold standby system with two stage repair and waiting time, Sankhya; The

Indian Journal of Statistics, 72-B, p. 01-10.

Gopalan M.N., Ramesh, T.K and Kumar Krishana (1986). Analysis of one

server two unit parallel systems subject to degradation, Microelectronics

Reliability, 26, p. 657-664.

Gupta, R and Goel, L.R. (1990). Cost-benefit analysis of two-unit parallel

system with administrative delay in repair, Int. J. of System Science, 21, p.

-1379.

Jaiswal, N.K. and Krishna J.V. (1980). Analysis of two dissimilar unit standby

redundant systems with administrative delay in repair, Int. J. of System

Science, 11, p. 495-511.

Mogha, A.K and Gupta, A.K. (2002). A Two priority unit warm standby

system model with preparation for repair, Aligarh J. of Statistics, 22, p. 73-90.

Mokaddis, G.S. and Tawfek, M.L. (1996). Some characteristics of a two-

dissimilar unit cold standby redundant system with three modes,

Microelectronics Reliability, 36(4).

Murari, K and Muruythachalam, C. (1981). Two-unit parallel system with

period of working and rest, IEEE Transactions on Reliability, R-30(1), p. 187-

Nakagawa, T and Osaki, S. (1975). Stochastic behaviour of tow-unit parallel

redundant system with preventive maintenance, Microelectronics Reliability,

, p. 457-461.

Sridharan, V. And Mohanavadiva, P. (1998). Stochastic behaviour of a two-

unit standby system with two types of repairman and patience time, Math.

Comput. Modelling, 28, p. 63-71.

Downloads

Published

2015-06-01

How to Cite

Chaudhary, A. ., Jaiswal, S. ., & Gupta, R. . (2015). A TWO UNIT PARALLEL LOAD SHARING SYSTEM WITH ADMINISTRATIVE DELAY IN REPAIR. Journal of Reliability and Statistical Studies, 8(01), 01–13. Retrieved from https://journals.riverpublishers.com/index.php/JRSS/article/view/21063

Issue

Section

Articles