Identification and Classification of Risk Factors in Distributed Agile Software Development

Esha Khanna*, Rashmi Popli and Naresh Chauhan

Computer Engineering, J. C. Bose University of Science and Technology, YMCA, Faridabad, Haryana, India
E-mail: eshakhanna30@gmail.com; rashmipopli@gmail.com; nareshchauhan19@gmail.com
*Corresponding Author

Received 16 June 2022; Accepted 07 September 2022; Publication 09 November 2022

Abstract

Distributed Agile Software Development (DASD) is an amalgamation of Agile Software Development (ASD) with Distributed Software Development (DSD). Although DASD integrates the speed benefits of ASD with the cost benefits of DSD, however, it brings along various risk factors that arise due to the fact that both ASD and DSD works on a different set of principles. These associated risks must be addressed and managed well in time for the successful completion of the project. This paper reviews the current literature and presents the current challenges of Risk Management in the DASD environment. This paper also determines 71 risk factors associated with DASD and analyses them based on their causes and sources. Further, these risk factors are segregated into 11 different categories. Timely management of these risks may reduce the uncertainty of project failure in the DASD environment.

Keywords: Risk management, distributed agile software development, agile software developments, distributed software development.

1 Introduction

Risks are unwanted events that have negative consequences on project completion [1]. Risks impact the success of the project by affecting the goals and objectives by exceeding time and cost and thereby reducing the overall quality [2]. Risk management is a process of identifying, analyzing and managing risks [1]. The goal of risk management is to forecast any upcoming uncertainty, that may fail in achieving project objectives it helps the management to take timely decisions to mitigate such uncertain situations.

Distributed Agile Software Development (DASD) is a new software developing methodology that blends the features of Agile Software Development (ASD) and Distributed Software Development (DSD). Although DASD combines the benefits of ASD and DSD, it brings along the possibility of various risk factors that must be managed on time to meet the project goals and objectives in limited budgets [3]. These risks emerge due to the difference in the working principles of ASD and DSD [4]. ASD focuses on face to face, frequent communication within small-sized collocated teams [5]. On the other hand, DSD exploits the low-cost talented team across the globe. In DSD, the team members are geographically separated and use internet tools for communication. This situation leads to different risk factors that complicates the project development process.

This paper aims to identify various risk factors in the DASD environment and presents the causes and sources of these risks. The goals of this paper are as follows.

• To carry out a literature review to study the risk management frameworks in DASD and present current challenges in this area.

• To present the risk factors associated with DASD and to segregate them into categories.

The paper is organized as follows. Section 2 presents the literature review and challenges in risk management in DASD. Section 3 presents the various risk factors associated with DASD and explains their sources and causes. Section 4 concludes.

2 Literature Review

2.1 Review

A systematic review has been carried out to find the gap in the existing literature. The review has been carried out as per the guidelines of Kitchenham [6]. The databases explored include IEEE explore, ACM, Springer, Wiley and Science Direct. Some of the important works have been summarized in this section. In the work by Eva Maria Schon, et al. [7], challenges associated with risk management in geographically distributed agile teams were identified and presented. A tool for risk management in scaled agile was designed. But the work is based on a single case study and authors have claimed to be biased in data collection.

In another work by Esteki, et al. [8], a risk management framework for Distributed Agile Development (DAD) was proposed using PRINCE 2 methodology. The work identified various risk factors associated with DAD and classified them into five categories of software development including software development lifecycle, collective awareness, project management, external stakeholder collaboration and launch of the technology. The work further stated that group awareness, the software development lifecycle, and project management are the riskiest categories.

Wan Suzila Wan Husin, Arzi Azmi [9] proposed an enhanced framework of risk management for a Telecommunication Company by accommodating the distributed nature of the organization. The work identified communication as a major risk followed by cultural differences, knowledge management and coordination.

In the work by Suprka Shrivastava, Urvashi Rathod [10], a goal-based risk management approach for DASD was presented. Taking time/cost/quality as parameters, the study presented the most important risk factors for DAD.

Edzreena Edza Odzaly, Des Greer, Darryl Stewart [11] proposed a semi-automated risk management framework for agile development using software agents. Software agents were used for risk identification, assessment and monitoring. The work explained the interaction between four software agents, i.e. manager agent, identify agent, assess agent and monitor agent, their designated rules and their reaction to the changing environment.

Suprika Vasudeva Shrivastava, Urvashi Rathod [12] developed a risk management framework for DASD by presenting the risks, their causes and mitigation strategies. Further, those risks were ranked according to their impact and criticality. Major risk areas of concern were presented as – Communication for collaboration, Third-party management, Software engineering practices, Team organization and management and communication and infrastructure tools. The purposive sampling technique was used to get responses from experienced practitioners working in DAD projects.

A. Elbanna, S. Sarker [13] presented key risks which led to the failure of agile-based projects. Reported risks included development and deployment risks & Project Management risks.

In the work by Suprika V. Shrivastava, Urvashi Rathod [14] 45 risk factors were identified and categorized into 5 categories i.e. SDLC risks, Group awareness risks, External Stakeholder collaboration risks, Technology setup risks, Project Management Risks.

Navid Vajdi, Raja Manzan Abbass [15] presented 10 risk categories and their mitigation techniques in DASD. The risk categories were further elaborated into subcategories.

E. Khanna et al. [16] presented a novel Artificial Intelligence based framework for managing risks in Distributed Agile Software Development.

2.2 Current Challenges in Risk Management in DASD

In DASD environment, software development is carried out in different units that are separated in different geographical areas. Risk managers of these independent units work in each sprint to find the risk factors and then manually create risk reports using spreadsheets and word processing software. The risk manager of the project then follows up with each of these units, goes through all the risk reports, gathers the relevant information and creates a report to be presented to executive boards. Manual risk management is purely dependent on the experience and analysis of the person conducting it and therefore is ineffective and inefficient [16]. There is a need for an automated risk assessment framework for risk identification, analysis and prioritization in DASD. A study in the literature has proposed the automated risk management model in agile-based software agents [11]. However, the work does not consider the scenario where agile teams are geographically distributed. One of the works, Artificial Intelligence based Risk Management Framework (AIRMF) is based on user stories, project goals, project environment data and risk database [16].

Table 1 Risk category: Requirement Elicitation

Source of the Risk
S. No. Risk Description Cause of the Risk DSD Property ASD Property
1 Unclear Requirements in Multiple Development Sites Issues in requirement gathering phase. Geographically separated teams Individual and interactions
2 Conflicts in Requirement due to Multiple Product Owners Differences in required requirements among client team, Delay in daily meetings with all clients and stakeholders. Geographically separated teams, time–zone differences Individual and interactions, customer collaboration
3 Inadequate Requirement Prioritization Requirements are not effectively prioritized for each sprint. Communication gaps, temporal and geographical differences Embracing changing requirements, the project developed in sprints
4 Frequent Requirements Changes No timely live demonstration to clients, Fluctuating requirements by client-side due to environment changes and competing market. Large project scope Embracing changing requirements, customer involvement in each sprint
5 Implicit Requirements Unclear and unstated requirements Geographically separated teams, cultural differences Face to face communication, frequent collaboration
6 Inadequate Communication With End Users About Requirements Lack of face to face communication due to geographically separated environment Geographically separated teams, time–zone differences Face to face communication, frequent collaboration

3 Risks Identification and Classification

This section presents various risk factors associated with the DASD environment. During the literature review, 71 risk factors are identified [631]. These risk factors are further classified into 11 different categories as follows:

1. Requirement Elicitation – Requirement elicitation is the process of identifying and gathering the requirements of the system from users, customers and other stakeholders [32]. Introspection, interviews, questionnaires, conversation and interaction are the techniques of requirement elicitation [33]. Risk factors in this category include Unclear Requirements in Multiple Development Sites, Conflicts in Requirement due to Multiple Product Owners, Inadequate Requirement Prioritization, frequent changes in requirements and inadequate communication. The causes and sources of these risks are presented in Table 1.

2. Objective statement – Unclear and ambiguous Objective statement gives rise to several risks which may lead to the failure of the software product. Ambiguity in the objective statement may arise due to cultural differences and lack of direct face to face meetings in the DASD environment. The causes and sources of these risks are presented in Table 2.

Table 2 Risk category: Objective Statement

Source of the Risk
S. No. Risk Description Cause of the Risk DSD Property ASD Property
1 Unclear Objective Lack of face to face meetings Geographically separated teams Face to face direct communication, frequent feedback, collaboration with the customer
2 Ambiguity In Objective Meaning Due To Cultural Differences The difference in language and culture Geographically separated teams, cultural differences, large team size. Co-located small teams
3 Inadequate Meetings With End-Users Lack of direct face to face meetings while stating objectives Geographically separated teams Frequent meetings daily standups

3. Design – Software design is the software life cycle process in which the requirements from SRS are translated into a description of a software system’s internal structure that can be used as a basis for construction [34]. In the DASD environment, frequent changes in requirements are embraced within the life cycle which in turn causes changes in SRS and design. These frequent changes leads to different risk factors. Further, lack of direct communication among team members due to geographically separated teams result in conflicts in design in multiple sites. Design inconsistency is also one of the risk factors that arise due to a lack of team cohesion and communication. Design related risks are presented in Table 3.

Table 3 Risk category: Design

Source of the Risk
S. No. Risk Description Cause of the Risk DSD Property ASD Property
1 Flexible Designs Due To Changing Requirements Frequent changes in requirements Geographically separated teams Embracing changing requirements, incremental design
2 Conflicts In Design Lack of direct communication among team members, lack of trust Geographically separated teams, no face to face communication, large project scope The co-located team, trust among team members, Frequent feedback, simple design
3 Design Inconsistency Lack of team cohesion and coordination Large team size, Indirect communication using internet tools Small teams working together in the same room, Daily standups

4. Coding – Inadequate pair programming and lack of coordination are the risk factors associated with the coding phase of the software development life cycle. Lack of trust and lack of mutual understanding are primary causes of these risks. Sources of these risks are presented in Table 4.

Table 4 Risk category: Coding

Source of the Risk
S. No. Risk Description Cause of the Risk DSD Property ASD Property
1 Inadequate Pair Programming Programmers in different units, Lack of face to face communication Geographically separate teams Small teams, supports pair programming, technical excellence coding standards.
2 Lack Of Coordination Lack of trust, lack of mutual understanding Cultural differences, time zone differences Self-organized teams, team motivation and support

5. Testing – Software Testing is the process of executing a program or system with the intent of finding errors [35]. Software testing is one of the important activities that is carried out to enhance the quality of software [36]. Software testing is based on requirement analysis and design specification [37]. Testing can be carried out manually or can be automated [38]. In the DASD environment, lack of proper documentation in initial software development phases leads to unavailability of requirements documents for testing. Further unavailability of testing data due to security and network issues is another risk factor related to testing in DASD. Use of different testing tools in different development sites, Inadequacy in the transfer of large testing data and integration testing are also some of the risk factors related to this category [39]. The causes and sources of these risks are presented in Table 5.

Table 5 Risk category: Testing

Source of the Risk
S. No. Risk Description Cause of the Risk DSD Property ASD Property
1 Unavailability Of Requirements Documents For Testing Lack of proper documentation during initial phases Geographically separated teams, time zone difference, language differences Less focus on heavy Documentation
2 Unavailability Of Real Testing Data Testing data not available due to security issues Geographically separated teams, time zone differences Test-driven development
3 Inadequacy In Transfer Of Large Testing Data Inability to transfer a large amount of personal data to geographically different locations Large project scope Test-driven development
4 Different Testing Tools Different testing tools used in different sites Geographically separated teams, large project scope Team motivation, proper training and support
5 Code Integration Integration testing of different modules from different sites Large project scope Continuous integration and testing (New code is integrated within the system and tested within a few hours of development)

6. Release and deployment – Risks in this category include inadequate sprint releases, integration and deployment risks and improper time and cost estimation. The causes and sources of these risks are presented in Table 6.

Table 6 Risk category: Release and Deployment

Source of the Risk
S. No. Risk Description Cause of the Risk DSD Property ASD Property
1 Inadequate Sprint Releases Improper time and cost estimation Large project scope Short iteration sprint
2 Integration And Deployment Different environments in multiple sites Large project scope Continuous integration and testing
3 Difference In Agile Practices And Principles At Different Sites Different teams following different principles Geographically separated teams and time-zone differences Self-organizing teams

Table 7 Risk category: Project Management

Source of the Risk
S. No. Risk Description Cause of the Risk DSD Property ASD Property
1 Exceeded Project Time(Lower Initial Velocity) Improper time estimation Geographically separated teams and time zone differences Face to face communication, Embrace changes in requirements
2 Exceeded Project Cost(Difficulty To Execute Fixed Price Products) Improper cost estimation Geographically separated teams and time zone differences User story backlog, Face to face communication, Embrace changes in requirements
4 Infinite Sprints Fluctuating Project requirements Large project scope Focus on small user stories
5 Infeasible Project Requirements infeasible Large project scope Frequent collaboration and face to face communication, direct feedback
6 Larger Team Sizes Unmanageable projects Large project scope Small teams
7 Reorganization Of Teams In Every Sprint(Task Distribution) Inadequate task distribution Large project scope Self-organizing teams
8 Insufficient Knowledge At Certain Sites. Unwillingness to share all the information due to lack of trust, inefficient communication. Geographically separated teams Team motivation, training and support, Adaptable self-organizing teams
9 Higher Interdependency Between The Teams High coupling Geographically separated teams User story backlog, Embracing changes in requirement
10 Team Recognizing In Every Sprint Outsourcing of modules Geographically separated teams, different time zone Frequent collaboration
11 Growth In Team Size Or Development Site Fluctuating project requirements Large project scope Self-organizing team
12 Unavailability Of Business Analyst Outsourcing of modules Large project scope Small teams
13 Lack Of Uniformity In Multiple Teams Capability Outsourcing of modules Large project scope Small, self-organizing teams
14 The Emergence Of Excessive Competition Between Teams Or Scrum Masters Lack of trust Geographically separated teams and time zone differences Self-organizing teams

7. Project Management – Software project management is a process of planning, implementing, monitoring and controlling a software project [33]. In the DASD environment various risk factors related to project management arises due to the contradicting properties of DSD and ASD. These risk factors include exceeded project time and costs, infinite sprints, reorganization of teams in every sprint, higher interdependency among teams, growth in team size, unavailability of business analysts, lack of uniformity in team capability in multiple sites Causes and sources of these risks are presented in Table 7.

8. Communication – Communication is an essential activity that presents the flow of information throughout the project. Communication is the crucial factor that is responsible for successful risk management [8]. In the paper by Wan Suzila Wan Husin, Arzi Azmi [8] communication was identified as a major risk followed by cultural differences, knowledge management and coordination. Risk factors related to communication are presented in Table 8 along with its causes and sources.

Table 8 Risk category: Communication

Source of the Risk
S. No. Risk Description Cause of the Risk DSD Property ASD Property
1 Lack Of Communication Among Team Members Indirect communication among multiple teams, lack of face to face communication Geographically separated teams and temporal differences. Face to face communication, frequent collaboration
2 Lack Of Communication Between Client And Team Lack of face to face communication, time zone differences Time Zone Differences Face to face communication, frequent collaboration
3 Poor Communication Skills Lack of face to face communication, Difference in the native language, time zone differences Geographical differences Frequent collaboration
4 Use Of Different Languages (Language Barriers) Lack of common language Geographical differences Frequent collaboration
5 Delayed Feedbacks Lack of communication, Lack of trust Individual responsibility of own role, no collective responsibility for overall project Collective code ownership, self-organizing teams, face to face honest communication
6 Misinterpretation Of Message Lack of communication, lack of trust, lack of mutual understanding Cultural differences, time zone differences Face to face communication, direct collaboration
7 Difference In Terminology Different words have different meanings Cultural differences, time zone differences Face to face communication, direct collaboration
8 Inadequate Documentation Lack of proper documentation during initial phases Geographically separated teams, time zone difference, language differences Less focus on heavy Documentation
9 Poor Coordination Lack of trust, lack of mutual understanding Cultural differences, time zone differences Self-organized teams, team motivation and support
10 No Face To Face Meetings Use of ICT tools for meeting due to geographical differences Geographical differences Face to face communication, direct collaboration
11 Lack Of Trust Among Different Teams Lack of trust, lack of mutual understanding Cultural differences, time zone differences Self-organized teams, team motivation and support

9. Technology-Based – Risks in this category includes Lack of training, inadequate tool selection and improper utilization of tools. The causes and sources of these risks are presented in Table 9.

Table 9 Risk category: Technology-Based

Source of the Risk
S. No. Risk Description Cause of the Risk DSD Property ASD Property
1 Lack Of Training Lack of time and budget Geographical Differences Shorter sprints
2 Inadequate Tool Selection Lack of budget Geographical Differences Shorter sprints
3 Lack Of Communication Lack of face to face communication, Difference in the native language, time zone differences, geographically separated teams Geographical differences Frequent collaboration
4 Improper Utilization Of Tools Lack of training, lack of time and budget Geographical Differences Shorter sprints

10. External Stakeholder – In DASD, many stakeholders are involved which influence the progress of the project. Inappropriate user story estimates by different vendors, Poor coordination among multiple vendors, outsourcing of modules and dependency on the third party are risk factors associated with this category. The causes and sources of these risks are presented in Table 10.

Table 10 Risk category: External Stakeholder

Source of the Risk
S. No. Risk Description Cause of the Risk DSD Property ASD Property
1 Unavailability Of Product Owners Lack of face to face meetings with product owner for feedback Time zone differences Frequent collaboration
2 Poor Coordination Between Multiple Vendors Lack of meetings among different vendors Large project scope Frequent collaboration
3 Inappropriate User Story Estimates By Multiple Vendors Changes in requirements and resources Large project scope Embrace changes in user requirement
4 Code Integration Risks With Multiple Vendors Integration testing of different modules from different sites Large project scope Continuous integration and testing (New code is integrated within the system and tested within a few hours of development)
5 Dependency On Third Party Outsourcing of modules Large project scope Collective code ownership, self-organizing teams, face to face honest communication

11. Group Awareness – These risk factors related to this category along with their causes and sources are presented in Table 11.

Table 11 Risk category: Group Awareness

Source of the Risk
S. No. Risk Description Cause of the Risk DSD Property ASD Property
1 Lack Of Communication Between Team And Client Indirect communication among multiple teams, lack of face to face communication Geographically separated teams and temporal differences. Face to face communication, frequent collaboration
2 Lack Of Communication Between Team Members Lack of face to face communication, time zone differences Time Zone Differences, geographical differences Face to face communication, frequent collaboration
3 Under Investment On Travel By The Management Lack of planned face to face meetings Time Zone Differences, geographical differences Face to face communication, frequent collaboration
4 Lack Of Documentation Lack of proper documentation during initial phases Geographically separated teams, time zone difference, language differences Less focus on heavy Documentation
5 Lack Of Face To Face Communication Teams scattered in different locations, Differences in the native language, time zone differences Geographical differences Frequent collaboration
6 Poor Collaboration Between Different Sites Lack of planned face to face meetings Time Zone Differences, geographical differences Face to face communication, frequent collaboration
7 Issue Of Coordinating The Members Of Scrum Masters And Product Owners Team Lack of planned face to face meetings Time Zone Differences, geographical differences Face to face communication, frequent collaboration
8 Lack Of Trust Between The Client And Offshore Teams Lack of trust, lack of mutual understanding Cultural differences, time zone differences Self-organized teams, team motivation and support
9 Lack Of Trust Between Onshore And Offshore Teams Lack of trust, lack of mutual understanding Cultural differences, time zone differences Self-organized teams, team motivation and support
10 Lack Of Collaboration Between Developers And Quality Assurance Members Lack of planned face to face meetings Time Zone Differences, geographical differences Face to face communication, frequent collaboration
11 Ineffective Scrum Of Scrum Meetings Lack of planned face to face meetings Time Zone Differences, geographical differences Face to face communication, frequent collaboration
12 Poor Coordination Between Multiple Teams Lack of planned face to face meetings Time Zone Differences, geographical differences Face to face communication, frequent collaboration
13 Unsuitability Of Agile Approach For Large Organizations Agile principles difficult to apply in a distributed environment Larger project scope Face to face communication, frequent collaboration
14 Delays And Problems In Group Decision Making Lack of open communication, delayed feedback, formal communication Individual responsibility of own role, no collective responsibility for overall project Collective code ownership, self-organizing teams, face to face honest communication
15 Uncommon Language The difference in the native language, time zone differences Geographical differences Face to face communication

4 Conclusion

Risk management is an important task that directly affects the cost and quality of the software. Bohem [1] defined risk management as “a discipline that aims to identify, address and eliminate risk items before they turn out to be a threat to a successful software project or become the main sources of software rework”. Lack of importance of risk management by project managers hinders the success of the project [8]. It has been observed that industrial risk management practices are not up to the mark of recommended risk management best practices. This gap is also observed in DASD. In Distributed Agile Software Development (DASD) environment, many risk factors arise due to the contradictory nature of Agile Software Development (ASD) and Distributed Software Development (DSD) principles. These risks must be identified well on time and must be analyzed for smooth completion of the DASD projects.

In the existing literature, several DASD related risks have been reported. These risks are further classified into several categories like communication risks, project management risks, external stakeholder risks, Software Development Life Cycle risks. These risks, though identified have not been mapped to software development tools. Practicing proper risk management in software development is one of the crucial factors for its success.

Risk management is one of the umbrella activities that is performed in each agile sprint to increase the efficiency of the software. Risks if identified and managed in time, decrease the threats of project failure. In a DASD environment, different categories of risk factors are faced at different periods. This work enlists all the risk factors associated with DASD available in the literature and classifies it into 11 different categories i. e. Requirement Elicitation, Objective statement, Design, Coding, Testing, Release and deployment, Project Management, Communication, Technology Based Risks, External Stakeholder, and Group Awareness. The work also presents the current challenges in risk management in DASD. The work further discusses the shortcomings of risk management practices in DASD.

References

[1] Boehm, Barry W, ‘Software Risk Management: Principles and Practices’, IEEE Software, 8:1, 32–41, 1991.

[2] Keshlaf, AA, Hashim, K, ‘A Model and Prototype Tool to Manage Software Risks’, Proceedings of the First Asia-Pacific Conference on Quality Software, APAQS ’00, IEEE Computer Society, 297–305, 2000.

[3] Supriya V, Shrivastava, HD, ‘A Framework for Risk Management in Globally distributed agile software development’, Interscience Management Review, 2:1, 32–41, 2010.

[4] Ramesh B, Cao L, Mohan K, Xu P, ‘Can distributed software development be agile?’, Communications of the ACM, 49:10, 41–46, 2006.

[5] A. Mcdonald, R. Welland, ‘Agile Web Engineering (AWE) Process: Perceptions Within A Fortune 500 Financial Services Company’, Journal Of Web Engineering, Vol 4, Issue 4, 2005.

[6] Kitchenham B, Charters S, ‘Guidelines for performing systematic literature reviews in software engineering’, Technical Report EBSE. School of Computer Science and Mathematics, 2007.

[7] Eva MS, Dirk R, Christian J, ‘Improving risk management in a scaled agile environment. International conference on Agile Software development XP’, Agile process in software Engineering and Extreme Programming, Springer, 132–141, 2020.

[8] Mohammad E et. al., ‘A risk management framework for distributed scrum using PRINCE2 methodology’, Bulletin of Electrical and Engineering Informatics, 9:3, 1299–1310, 2020.

[9] Wan S, Wan H, Arzi A, ‘Risk Management framework for distributed software team- A case study of Telecommunication company’, Procidia Computer science, Science Direct, 2019.

[10] Suprka S, Urvashi R, ‘Risk Management approach for distributed agile developments projects’, Australasian Journal of Information Systems, 23, 2019.

[11] Edzreena EO, Des G, Darryl S, ‘Agile risk management using software agents. Journal of Ambient Intelligence and Humanized Computing’, Springer, 9: 823–841, 2018.

[12] Suprika VS, Urvashi R, ‘A Risk Management Framework for distributed agile projects. Information and software technology’, Elsevier, 1–15, 2017.

[13] Elbanna A, Sarker S, ‘Risks of agile software development: Learning from Adopters’, IEEE Software, 33:5, 72–79, 2016.

[14] Suprika VS, Urvashi R, ‘Categorization of risk factors for distributed agile projects. Information and software technology’, Elsevier, 1–15, 2014.

[15] Navid V, Raja MA, ‘Distributed software development Agile Risk management framework: A systematic Literature Review’, M. Tech Thesis, Dept of CSE, Chalmers University of tehnology, University of Gothenbung, Sweden, 2014.

[16] Khanna E, Popli R, Chauhan N, ‘Artificial Intelligence based Risk Management Framework for Distributed Agile Software Development’, 8th International Conference on Signal Processing and Integrated Networks (SPIN), 657–660, doi: 10.1109/SPIN52536.2021.9566000, 2021.

[17] Keshlaf, Ayad A, Riddle S, ‘Risk Management for Web and Distributed Software Development Projects’, Internet Monitoring and Protection (ICIMP), Fifth International Conference on, IEEE, 2010.

[18] Lamersdorf A, Jurgen M, Alicia FVT, Carlos RS, ‘A Risk-Driven Model for Work Allocation in Global Software Development Projects’, Proceedings of the 6th IEEE International Conference on Global Software Engineering, ICGSE11, IEEE Computer Society, 8: 15–18, 2011.

[19] Nguyen, Thanh HD, Bram A, Ahmed EH, ‘Does Geographical Distance Effect Distributed Development Teams: How Aggregation Bias in Software Artifacts Causes Contradictory Findings’, Software Reliability Engineering (ISSRE), 27th International Symposium, IEEE, 2016.

[20] Yasser C et al., ‘Software Project Management Tools in Global Software Development: A Systematic Mapping Study’, SpringerPlus, 5:1, 2006.

[21] Nurdiani I, Ronald J, Darja Š, Damian D, ‘Risk Identification and Risk Mitigation Instruments for Global Software Development: Systematic Review and Survey Results. Global Software Engineering Workshop (ICGSEW)’, Sixth IEEE International Conference on, IEEE, 2011.

[22] Nordio M, Christian HE, Betrand M, Julian T, Carlo G, Elizabeth DN, ‘How Do Distribution and Time Zones Affect Software Development? A Case Study on Communication’, Global Software Engineering, 2011.

[23] Bosnić I, Ciccozzit F, Ćavrak I, Mirandola R, Orlić M, ‘Multi-dimensional Assessment of Risks in A Distributed Software Development Course. Collaborative Teaching of Globally Distributed Software Development (CTGDSD)’, 3rd International Workshop, IEEE, 2013.

[24] Honório FJ, Ivaldir RR, Hermano PM, Dennis SMS, ‘Elicitation of Communication Inherent Risks in Distributed Software Development’, Global Software Engineering Workshops (ICGSEW), IEEE Seventh International Conference, 2012.

[25] Mudumba V, Lee OD, ‘A New Perspective on GDSD Risk Management: Agile Risk Management’, 5th IEEE International Conference on Global Software Engineering (ICGSE), International Journal of Computer Science, 35:4, 2008.

[26] Wattanapokasin W, Wanchai R, ‘Cross-cultural Risk Assessment Model’, International Conference on Signal Processing Systems, IEEE, 2009.

[27] Reed A, Knight L., ‘Project Risk Differences Between Virtual nd Collocated Teams’, Journal of Computer Information Systems, 51:1, 19-30, 2010.

[28] Betz S, Hickl S, Oberweis A., ‘ Risk Management in Global Software Development Process Planning’, Proceedings of the 37th EUROMICRO Conference on Software Engineering and Advanced Applications, SEAA11, IEEE Computer Society, 357–361, 2011.

[29] Jurgen M., ‘Risk Management in Global Software Development Projects: Challenges, Solutions, and Experience’. Global Software Engineering Workshop (ICGSEW), IEEE, 2011.

[30] Khan Q, Ghayyur S, ‘Software Risks and Mitigation in Global Software Development’, Journal of Theoretical & Applied Information Technology, 22:1, 2010.

[31] Abufardeh S, Kenneth M, ‘The Impact of Global Software Cultural and Linguistic Aspects on Global Software Development Process (GSD): Issues and Challenges’. 4th International Conference on New Trends in Information Science and Service Science (NISS), 133–138, 2010.

[32] Rowel R, Alfeche K,’Requirements Engineering A good practice guide’, John Wiley and Sons, 1997.

[33] J. A. Goguen and C. Linde,’ Techniques for requirements elicitation’, Proceedings of the IEEE International Symposium on Requirements Engineering, pp. 152–164, 1993.

[34] Pressman, R.S., ‘Software engineering: a practitioner’s approach’ McGraw-Hill Higher Education, 2010.

[35] Chauhan, N, ‘Software Testing: Principles and Practices’, Oxford Publications, 2010.

[36] N. Sánchez-Gómez, et al., ‘The importance of testing in the early stages of smart contract development life cycle’, Journal of Web Engineering, special issue: Advanced Practices in Web Engineering, 2020.

[37] Bhasin, H., Khanna, E., Sudha, ‘Black Box testing based on Requirement Analysis and Design Specification’, International Journal of Computer Applications (IJCA), volume 87, no. 18, 2014.

[38] R. D. A. Neves, Et. Al., ‘Morpheus Web Testing: A Tool For Generating Test Cases For Widget Based Web Applications’, Journal Of Web Engineering, Vol 21, Issue 22, 2021.

[39] Sengupta B, Chandra S, and Sinha V, ‘A research agenda for distributed software development’ in Proceedings of the 28th international conference on Software engineering (ICSE ’06). Association for Computing Machinery, New York, NY, USA, 731–740, 2006.

Biographies

images

Esha Khanna is currently pursuing Ph. D. in Computer Engineering from J. C. Bose University of Science and Technology, YMCA, Faridabad. She is Master of Technology in Computer Engineering and Bachelor of Technology in Computer Science and Engineering. She has teaching experience of 7 years. Her main research area focuses on Machine Learning, Software Testing, Software Engineering and Data mining.

images

Rashmi Popli is Deputy Dean, Consultancy in J.C. Bose University of Science and Technology, YMCA Faridabad. She has 15 years of rich experience in Teaching and 4 research scholars are pursuing PhD under her guidance and supervision. Her areas of specialization include Software Engineering, Testing, Network Security and automation of software. She has published more than 50 research papers in various International Journals and conferences. She is a life time member of ISTE and CSI. She is also holding the position of Director, Industrial Relations Cell since 2017 working towards opening the various avenues where University can collaborate with Industry.

images

Naresh Chauhan received his Ph.D. (Computer Engg.) from MD University, Rohtak (Haryana) in 2008, M.Tech. (Information Technology) from GGS IndraPrastha University, Delhi in 2004 and B.Tech. (Computer Engg.) from NIT Kurukshetra, in the year 1992. He has about 28 years of experience in teaching and Industries. He served Bharat Electronics Ltd. and Motorola India Ltd. Presently, he is working as Professor in Deptt. of Computer Engg. at JC Bose University of Science & Technology, Faridabad (India). His research interest includes Internet technologies, Software Engineering, Software Testing and Real time systems. He has published two books on Software Testing and Operating Systems published from Oxford University Press, India.