ANALYSIS OF A COMPUTER SYSTEM WITH HARDWARE REPAIR AND SOFTWARE REPLACEMENT SUBJECT TO CONDITIONAL ARRIVAL TIME OF THE SERVER

Authors

  • Joginder Kumar Department of Statistics, Sri Venkateswara College, University of Delhi, Delhi

Keywords:

Computer System, H/w Repair, S/w Replacement, Conditional Arrival Time of the Server, Reliability and Profit Analysis.

Abstract

The focus of this paper is on reliability and profit analysis of a computer system of two identical units- one is initially operative and other is kept as spare in cold standby. In each unit, hardware (h/w) and software (s/w) fail independently from normal mode. There is a single server who is allowed to take some time at s/w failure with the condition that he has to visit the system immediately at h/w failure. The unit is repaired at h/w failure while replacement of the s/w by new one is done by giving some replacement time when s/w fails to execute the required instructions properly. Server can leave the system only after finishing all jobs available to him. All random variables are statistically independent. The time to failure of h/w and s/w is exponentially distributed while the arrival time of the server, repair time of h/w and replacement time of s/w are arbitrarily distributed with different probability density functions (pdf). By adopting semi-Markov process and regenerative point technique, the expressions for various reliability characteristics are derived to make profit analysis. The behaviour of some important measures of system effectiveness has also been shown graphically for a particular case.

Downloads

Download data is not yet available.

References

Friedman, M.A. and Tran, P. (1992). Reliability techniques for combined

hardware / software systems, Proceedings of Annual Reliability and

Maintainability Symposium, p. 209-293.

Malik, S. and, Poonam (2015). Stochastic analysis of a parallel system with

failure of service facility, Journal of Reliability and Statistical Studies (JRSS),

Vol. 8 (2), p. 97-106.

Malik, S. C. and Anand, Jyoti (2010). Reliability and economic analysis of a

computer system with independent hardware and software failures. Bulletin of

Pure and Applied Sciences, Vol. 29E (No.1), p. 141-153.

Malik, S. C. and Kumar, A. (2011). Profit analysis of a computer system with

priority to software replacement over hardware repair subject to maximum

operation and repair times, International Journal of Engg. Science and

Technology (IJEST), Vol.3 (10), p. 7452-7468.

Malik, S. C. and Sureria, J. K. (2012). profit analysis of a computer system

with h/w repair and s/w replacement, International journal of Computer

Applications, Vol. 47, No. 1, p. 19-26.

Malik, S.C. and Deswal, Savita (2015). Reliability measures of a system of

two non-identical units with priority subject to weather conditions, Journal of

Reliability and Statistical Studies (JRSS), Vol. 8 (1), p. 181-190.

Malik, S.C. and Sureria, J. K. (2012). reliability and economic analysis of a

computer system with priority to h/w repair over s/w replacement,

International Journal of Statistics and Analysis, Vol.2 (4), p.379- 389.

Sureria, J. K., Malik, S. C. and Anand, Jyoti (2012). Cost-benefit analysis of a

computer system with priority to s/w replacement over h/w repair, Applied

Mathematical Sciences, Vol. 6, No.75, p. 3723 - 3734.

Welke, S.R., Johnson, B. W. and Aylar, J. H. (1995). Reliability modeling of

hardware/software systems, IEEE Transactions on Reliability, Vol. 44, No. 3,

p. 413-418.

Downloads

Published

2020-08-18

How to Cite

Kumar, J. . (2020). ANALYSIS OF A COMPUTER SYSTEM WITH HARDWARE REPAIR AND SOFTWARE REPLACEMENT SUBJECT TO CONDITIONAL ARRIVAL TIME OF THE SERVER. Journal of Reliability and Statistical Studies, 10(01), 113–122. Retrieved from https://journals.riverpublishers.com/index.php/JRSS/article/view/20973

Issue

Section

Articles