ON THE USE OF CORRECTIVE MAINTENANCE DATA FOR PERFORMANCE ANALYSIS OF PREVENTIVELY MAINTAINED TEXTILE INDUSTRY
Keywords:
Availability, Chapman-Kolmogorov Equations, Maintenance Scheduling, Numerical Methods, Textile Weaving Process.Abstract
In this paper, a method is proposed to improve the scheduled preventive maintenance of the system by assessing different kinds of availability and illustrated how the corrective maintenance data can be helpful to reschedule preventively maintained system. This method uses the concept of inherent availability to ensure to what extent maximum availability can be extended. The application of the proposed methodology has finally been demonstrated to six unit textile weaving industry situated in northern India. A mathematical formulation of Chapman – Kolmogorov differential difference equations, determining its availability, has been developed. A numerical study has been carried forward to quickly analyze the availability of the system on the actual corrective maintenance data taken from this industry.
Downloads
References
Caputo, Antonio C. and Paolo Salini (2009). Influence of Preventive
maintenance policy on manufacturing systems performances, Proceedings Of
the World Congress on Engineering, p. 1-3.
Garg, H., Rani, M. and Sharma, S. P. (2013). Preventive maintenance
scheduling of pulping unit in a paper plant, Japan Journal Industrial and
Applied Mathematics, 30, p. 397- 414.
Garg, H., Sharma, S. P. and Rani, M. (2012). Behavior analysis pulping unit in
a paper mill with Weibull fuzzy distribution function using ABCBLT
technique, International Journal of Applied Mathematics and Mechanics, 8(4),
p. 86-96.
Geol P. and Singh, J. (1995). Availability analysis of a stand by complex
system having imperfect switch, Microelectronics and Reliability, 35, p. 285-
Gupta P., Lal A. K, Sharma, R.K. and Singh J. (2005). Numerical analysis of
reliability and availability of the serial processes in butter-oil processing plant,
International journal of Quality and Reliability Management, 22(3), p. 303-16.
Gupta P., Lal, A. K, Sharma R. K. and Singh J, (2007). Analysis of Reliability
and Availability of serial Plastic-Pipe Manufacturing, Plant International
Journal of quality & Reliability Management, 24(4) , p. 404-419.
Gupta P., Singh J. and Singh I. P. (2005). Mission Reliability and Availability
Prediction of Polymer Powder Production System, OPSEARCH, 42(2), p.
-167.
Herder P. M., Brujinooge J. and Van Luijk J. A. (2008). Industrial Application
of RAM Modeling: Development and Implementation of RAM simulation
model for the Lexan Plant at GE industrial Plastics, Reliability Engineering
and System Safety, 93, p. 501-508.
Kumar, D. and Pandey, P.C. (1993). Maintenance planning and resourse
allocation in a urea fertilizer plant, Quality Reliability Engineering
International, 9(5), p. 411-423.
Lal, A. K., Kaur, Manwinder and Lata, Sneha (2013). Behaviour Analysis of
Piston manufacturing plant, Journal of Industrial Engineering International, 9,
p. 24-36.
Leou, R. (2006). A method for unit maintenance scheduling considering
reliability and operation expense, Electric Power Energy System, 28, p. 471-
Mahajan P., Singh J. (1999). Reliability of utensils manufacturing plant,
Opsearch,36, p. 260-269.
Pandey, S. B., Singh, S. B. and Sharma Shweta (2008). Reliability and cost
analysis of a system with multiple components using Copula, Journal of
Reliability and Statistical Studies, 1(1), p. 25-32.