Abstract

A stochastic model for a cold standby system of two identical units is developed in which unit fails completely either directly from normal mode or via partial failure. The unit undergoes preventive maintenance (PM) after a maximum operation time (MOT) at its partial failure stage (PFS). There is a single server who visits the system immediately as and when needed to do preventive maintenance and repair. The priority for operation to new unit is given over the partially failed unit. The failure and maximum operation times of the unit are distributed exponentially while the distributions of PM and repair times are taken as arbitrary. The expressions for some reliability measures of the system are derived using semi-Markov process and regenerative point technique. The numerical results for the particular values of parameters and various costs are obtained to show the behavior of MTSF, availability and profit.

Downloads

Download data is not yet available.

References

Gopalan, M.N. and Naidu, R.S. (1983). Analysis of a two-unit reparable

system Subject to two types of failures and inspections, Microelectron Reliab.

(3), p. 445-447.

Singh, S.K. (1989). Profit evaluation of a two-unit cold standby system with

random appearance and disappearance of the service facility, Microelectron.

Reliab., 29, p. 705-709.

Goel, L.R. and Sharma, S.C. (1989). Stochastic analysis of a two-unit standby

system with two failures modes and slow switch, Microelectron Reliab.,

(4),. P. 493-498.

Singh, S.K. and Agrafiotis, G.K. (1995). Stochastic analysis of a two-unit cold

standby system subject to maximum operation and repair time, Microelectron.

Reliab., 35(12), p. 1489-1493.

Chander, S. (2005). Reliability models with priority for operation and repair

with arrival time of the server, Pure and Applied Mathematika Sciences,

LXI(1-2), p. 9-22.

Downloads

Published

2010-12-01

How to Cite

Nanda, N. ., Malik, S. ., & Nandal, P. . (2010). STOCHASTIC MODELING OF A SYSTEM WITH PRIORITY FOR OPERATION TO NEW UNIT AND PREVENTIVE MAINTENANCE AT PFS SUBJECT TO MOT. Journal of Reliability and Statistical Studies, 3(02), 79–91. Retrieved from https://journals.riverpublishers.com/index.php/JRSS/article/view/22015

Issue

Section

Articles